New concrete patio slab behind a house, Port Coquitlam

Concrete Slabs & Pads

Concrete slabs and pads, formed to drain and built for the load

A slab looks simple until it cracks, puddles or sinks. What decides that happens before the pour: the base, the steel, the thickness for what sits on it, and the slope set into the forms. We form, reinforce and pour slabs for patios, hot tubs, garages, sheds and equipment.

Finished wet patio slab along the back of the house with forms still on. Port Coquitlam.

Slabs and pads we pour

Concrete patio slabs

An outdoor floor that slopes away from the house, with control joints placed where the cracks would want to go. Finish choice changes the price more than the slab does.

Concrete patio slabs in depth →

Hot tub and swim spa pads

A level pad thick enough for a full tub, with conduit planned in before the pour, because hot tub wiring needs an electrical permit in BC. If your existing patio is thin or cracked, it shouldn't carry a tub. Maple Ridge needs a pool permit for hot tubs “except for self-contained hot tubs with a locking cover”, and a large swim spa can count as a pool, so we check that with the City.

Source: Technical Safety BC on hot tub permits; Maple Ridge Building Bylaw No. 8097-2026

Garage floors and shop slabs

Thicker slabs and more steel where trucks, a hoist or machines sit, with the slope to the door or a floor drain set in the forms. Replacing a cracked floor adds break-out and fixing the base that failed.

Shed pads

A dry, flat floor under a shed. If the slab is the shed's floor, it gets a raised edge or curb so rain doesn't run in.

Heat pump, AC and generator pads

Poured to the installer's size and height, with gas and electrical lines planned into the location for a generator.

Sport court pads

Half or full court, with joints laid out to stay off the playing lines and the hoop footing poured separately.

What the base and the inspection have to do with cracks

Most slab failures start under the slab: soft ground, a thin or wet base, or roots. We dig out to firm ground, compact the base, and set steel sized to what the slab will carry. On permitted work in Maple Ridge, the City inspects the ground preparation (and radon rough-in under a building slab) before the concrete goes down.

Drainage is set in the forms. A patio slopes away from the house; a garage floor slopes to the door or a drain. It can't be added after the pour.

Source: Maple Ridge Building Bylaw No. 8097-2026

Patios and paving don't need a building permit in Maple Ridge

Maple Ridge's building bylaw leaves landscaping and paving out of its definition of a structure, so a patio slab on the ground or a sport court doesn't need a building permit. Slabs under a building, such as a garage or a shed over 10 m², do.

Source: Maple Ridge Building Bylaw No. 8097-2026

From our job sites

Real jobs, including the forms before the pour, which is the part you can't see once the concrete is in.

Gravel base spread for a backyard patio, Port Coquitlam
Gravel base spread in the excavated patio area with stakes along the edge. Port Coquitlam.
Diamond-pattern patio forms over rebar in North Vancouver
Diamond-pattern wood forms set on a rebar grid for a patio slab beside an arched house. North Vancouver.
Diamond-pattern patio forms on mesh at an arched house, North Vancouver
Diamond-pattern form strips on wire mesh in front of a white arched house, photographer shadow. North Vancouver.
Freshly poured patio slab in forms, Port Coquitlam
Freshly placed patio slab inside forms with a worker hosing at the house. Port Coquitlam.
Freshly finished patio reflecting a white arch, North Vancouver
Wet patio surface reflecting a white arch, yard work beyond. North Vancouver.
Finished concrete patio along a house, Port Coquitlam
Wet finished patio slab running along the house, fence behind. Port Coquitlam.
L-shaped concrete patio behind a house, Port Coquitlam
L-shaped finished concrete patio against the house, crew grading soil around it. Port Coquitlam.
Concrete patio with artificial turf diamond inlay, North Vancouver
Finished concrete patio with artificial turf strips inlaid in a diamond pattern, outdoor furniture behind. North Vancouver.

Before you build: guides

Common questions

Can a 4 inch concrete slab hold a hot tub?+

Sometimes, if it's sound, reinforced and on a good base. A thin, cracked or unreinforced patio is a risk once a full tub is on it. We check the slab you have and tell you straight whether it'll carry the tub or whether a new pad is the safer call.

Is 4 inches of concrete enough for a garage floor?+

For cars on a well-prepared base it's common. Heavy trucks, a hoist or shop machines call for a thicker slab, more steel and local thickening under the load.

Should I put my shed on a concrete pad?+

A concrete pad gives the longest-lasting, driest floor. A gravel pad with piers costs less and suits many prefab sheds. The shed's size, floor and the ground decide which is worth it.

Do I need a permit for a concrete patio in Maple Ridge?+

Not a building permit. Maple Ridge's bylaw leaves paving out of its definition of a structure. A slab under a building, such as a garage or a shed over 10 m², does need one.

Source: Maple Ridge Building Bylaw No. 8097-2026

How much does a concrete slab cost?+

We don't estimate blind, because size, access, digging, steel and finish move the number more than the concrete does. Send a photo and rough measurements with the booking form and John will tell you what drives the price on your job, then give you a written estimate after the site visit.

How it works

Four steps, and nothing is ordered or dug until you sign off.

Every job is backed by our 2-year workmanship warranty
  1. Call or book a site visit

    Call John, or tap Book now and send a photo of the spot with rough measurements if you have them.

  2. Site walk

    John comes out, walks the site, checks access, slope and drainage, and tells you which permits and inspections the job needs.

  3. Plan and design

    You get a clear plan, the design and a written scope and estimate. Finishes are chosen and the build date is locked in before anything is ordered or any ground is broken.

  4. Build

    Forms are set, inspected and poured. You get updates as we go and a clean site at the end.

Rather talk it through? Call John at (778) 200-8030 · All services

Builder or GC? Call John to talk through the project, or email the details and drawings to john@bedrockandcedar.com. How it works for builders

Call John